Showing posts with label Aircraft. Show all posts
Showing posts with label Aircraft. Show all posts

Wednesday, April 5, 2017

General Warns of Need to Boost Airlift Capacity | Military.com

General Warns of Need to Boost Airlift Capacity | Military.com: The Air Force projects its muscle through fighter jets, bombers and drones. But without tankers, those aircraft are short on flight time. And without airlift support, the pilots, crew and maintenance units needed to keep them flying stay stateside.

That connection is what Air Mobility Commander Gen. Carlton D. Everhart II wants lawmakers to remember. And it's why the service is working to upgrade its C-5 Galaxy fleet and keep its C-17 Globemaster III aircraft in key condition.

"Just a few years ago, we had 112 C-5s. Today, we have 56," Everhart told congressional staffers during a demonstration day here March 31. The presentation included a tour a C-5, plus two C-17s and a C-130 Hercules.

Sequestration resulted "in moving eight C-5s into backup aircraft inventory … which means we still have the aircraft but lost all manning and funding to operate them," he said.

Now Everhart wants them back, and he's making it his top priority.

"I need them back because there's real world things that we've got to move, and they give me that … added assurance capability," he said.

"Those eight C-5Ms? I was going to buy them back within a two-year period," Everhart said. With budget caps in place and without an appropriations bill, "that's been delayed twice … in two budget cycles."

Friday, January 8, 2010

UPDATE 1-Lockheed says F-35 program not in trouble | Reuters

UPDATE 1-Lockheed says F-35 program not in trouble Reuters: "Lockheed Martin on Wednesday said it was continuing work to sharply reduce the costs of the F-35 fighter and did not believe the program was in trouble despite a report that the Pentagon will cut production of 122 airplanes through 2015.
Lockheed spokesman Chris Geisel said the company was running about four to six months late on finishing the final four of 19 developmental aircraft, which in turn prevented completion of all the flight tests planned by the end of 2009.
But he said the gap was narrowing between Pentagon and Lockheed projections about the cost and time required to complete the development program and the company was continuing its drive to lower overall costs on the program."

Gates orders delay in buying Lockheed's F-35 fighter jets | Business | Star-Telegram.com

Gates orders delay in buying Lockheed's F-35 fighter jets Business Star-Telegram.com: "Defense Secretary Robert Gates has directed Pentagon planners to delay purchases of Lockheed Martin’s F-35 fighter jet to provide additional funding for development and testing.
Gates’ directive would cut planned purchases by 10 jets in fiscal 2011 and a total of 122 planes through 2015, according to a budget document. The cuts amount to 25 percent of the 483 planes originally scheduled in those years.
More than $2.8 billion that was previously budgeted to begin equipping the military with F-35s would instead be used to continue development of the next-generation combat jet."

Thursday, January 7, 2010

Air Force holds off on retiring famed reconnaissance plane | Stars and Stripes

Air Force holds off on retiring famed reconnaissance plane Stars and Stripes: "the high-altitude U-2 reconnaissance plane is so valued for its intelligence-gathering capabilities that, even in an age of high-tech unmanned drones, the old spy plane has found a whole new mission over the battlefields of Afghanistan and Iraq.
The U-2 reconnaissance plane’s mission is changing. The new mission amounts to a landmark shift in how the venerable aircraft can be used: The U-2 now gives direct support to ground operations, including assisting troops in firefights.
Unmanned drones can “look” — get pictures of the battlefield. But so far, they can’t “listen” — eavesdrop electronically.
The U-2 does both."

Tuesday, January 5, 2010

Air Force officials issue notice of intent for F-35 basing

Air Force officials issue notice of intent for F-35 basing: "Air Force officials here published the notice of intent in the Federal Register Dec. 30 to prepare an environmental impact statement to assess the potential environmental impacts of a proposal to establish operational F-35 Lightning II aircraft at one or more existing Air Force and Air National Guard installations within the continental United States.

The F-35, the Air Force variant of the joint strike fighter, is the next generation, stealth air-to-ground fighter, designed to complement the F-22 Raptor and replace aging and legacy aircraft.

The proposed basing alternatives include"

Monday, December 28, 2009

MC-12 arrives, heralds activation of 4th ERS

MC-12 arrives, heralds activation of 4th ERS: "The newest aircraft to the Air Force's inventory arrived Dec. 27, 2009, to Bagram Airfield. The MC-12 aircraft, tail number 090623, was the first of an undisclosed number of aircraft for the new 4th Expeditionary Reconnaissance Squadron here.

Following the MC-12's arrival, the 4th Expeditionary Reconnaissance Squadron was activated to carry out MC-12 operations in the Afghan theater of operations."

Wednesday, December 23, 2009

Unmanned Aerial Systems aid 1st AF mission

Unmanned Aerial Systems aid 1st AF mission: "Unmanned aircraft are currently used by the Air Force for long-endurance, medium and high altitude surveillance and reconnaissance missions, and operate primarily outside the borders of the United States in places like Iraq and Afghanistan.

'We're working toward developing standardized policies and procedures―a necessary template―for all services to integrate and gain FAA approval for domestic UAS operations,' said 1st Air Force commander Maj. Gen. Garry Dean."

Tuesday, December 22, 2009

Thunderbolts receive wing modification

Thunderbolts receive wing modification: "The A-10 Thunderbolt II will continue flying close-ground-support missions for the next two decades because of a reinforcement process wing replacement specialists call 'Hog Up.'

The phrase originated about a decade ago during an upgrade of the aircraft's avionics system, partially because of the A-10's 'Warthog' nickname. Specialists in the 309th Maintenance Wing's Aerospace Maintenance and Regeneration Group at Davis-Monthan Air Force Base and Hill Air Force Base, Utah, install steel straps and stronger fittings to the wings that give the A-10 an additional 8,000 flying hours"

Friday, December 18, 2009

New U.S. bomber funding seen in 2011

New U.S. bomber funding seen in 2011: "The Pentagon's delayed funding for a new Air Force long-range bomber is likely to be included in its fiscal spending for 2011.
The on-again-off-again program has been in limbo since U.S. Defense Secretary Robert Gates froze it earlier this year, saying it should be assessed in the Defense Department's Quadrennial Defense Review, which reviews weapons programs every four years.
Initial assessments of that review, officials say, suggest the need for both manned and unmanned long-range strike capabilities."

Tuesday, December 15, 2009

C-27J training operations center opens

C-27J training operations center opens: "Air Force, Army and community officials celebrated the opening of a new cargo plane schoolhouse Dec. 9, here.

The C-27J Joint Cargo Aircraft Schoolhouse will be used to train pilots of the C-27J, the new cargo plane used to reduce the need for ground convoys in dangerous areas.

After years of development by the Army, the C-27J Spartan program has shifted to the Air Force, but will be a joint program and both Army and Air Force pilots and loadmasters will attend the school."

Friday, December 11, 2009

X-51A WaveRider gets first ride aboard B-52

X-51A WaveRider gets first ride aboard B-52: "The X-51A Waverider was carried aloft for the first time Dec. 9 by an Air Force Flight Test Center B-52 Stratofortress
over Edwards Air Force Base, Calif.

The test was a key milestone in preparation for the X-51 to light its supersonic combustion ramjet engine and propel the WaverRider at hypersonic speed for about five minutes, before plunging into the Pacific Ocean."

Wednesday, December 9, 2009

US Air Force confirms 'Beast of Kandahar' drone

US Air Force confirms 'Beast of Kandahar' drone: "The US Air Force on Tuesday confirmed for the first time that it is flying a stealth unmanned aircraft known as the 'Beast of Kandahar,' a drone spotted in photos and shrouded in secrecy.
The RQ-170 Sentinel is being developed by Lockheed Martin and is designed 'to provide reconnaissance and surveillance support to forward deployed combat forces,' the air force said in a brief statement.
The 'RQ' prefix for the aircraft indicates an unarmed drone,"

Monday, December 7, 2009

Army Technology - EADS Light Utility Helicopters Set for US Army

Army Technology - EADS Light Utility Helicopters Set for US Army: "The US Army has awarded a contract to EADS North American Defense to provide 45 UH-72A light utility helicopters and associated medical evacuation (MEDEVAC) equipment.
Under the $247.2m contract, EADS will also provide 30 MEDEVAC mission equipment packages, 30 MEDEVAC B-kits, 30 hoist B-kits and four personnel mission equipment packages."

Saturday, December 5, 2009

Dover C-5Ms complete test in surge operations

Dover C-5Ms complete test in surge operations: "The C-5M Super Galaxy team has completed another stage of operational test and evaluation with the conclusion of surge operations at Dover AFB. The surge operations consisted of 31 days of delivering essential cargo and flying sorties nonstop, from Dover AFB to Incirlik Air Base, Turkey, without refueling to test wartime contingency operations.

'Our maintainers spent the last 12 months training for this big game. Not only are they hitting a home run with regards to operational test and evaluation, but they hit a grand slam during the surge. The C-5M is a strategic airlift revolution -- proven by successful completion of the Dover to Incirlik surge,'"

Friday, December 4, 2009

MDT Tiger Light Protected Vehicle - Army Technology

MDT Tiger Light Protected Vehicle - Army Technology: "The MDT Tiger light protected vehicle (LPV) is a mine protected light all-terrain vehicle manufactured by the Arotech Corporation's (Arotech) MDT Armor Division. It was launched by Arotech on 5 October 2009 at the annual meeting of the Association of the US Army (AUSA).
It is based on the commercially off-the-shelf Dodge Ram 5500 platform that was launched at the 2009 Chicago Auto Show. The vehicle can carry a crew of between six and nine members."

Wednesday, December 2, 2009

Northrop, Airbus threaten to pull out of tanker bid: Pentagon

Northrop, Airbus threaten to pull out of tanker bid: Pentagon: "Northrop Grumman and Airbus have threatened to withdraw from the competition for the multi-billion-dollar contract to build a new US military tanker aircraft, the Pentagon said on Tuesday.
'The (Defense) Department regrets that Northrop-Grumman and Airbus have taken themselves out of the tanker competition and hope they will return when the final RFP (request for proposal) is issued,' Pentagon spokesman Bryan Whitman said in a statement."

MC-12 reaches 1,000th combat mission

MC-12 reaches 1,000th combat mission: "JOINT BASE BALAD, Iraq (AFNS) -- Members of the 362nd Expeditionary Reconnaissance Squadron here, recently reached 1,000 combat sorties in the MC-12W aircraft only five months after arriving in-theater.

Currently operating only at Joint Base Balad, the MC-12 is one of the Air Force's newest platforms for intelligence, surveillance and reconnaissance. It's not just an eye in the sky, it also serves as a complete collection, processing, analysis and dissemination system.

The modified aircraft system consists of sensors, a ground exploitation cell, line-of-sight and satellite communication datalinks, and a robust voice communications suite, all with manpower for 24-hour operations."

Tuesday, December 1, 2009

Helicopter revitalization program launches final refurbished Black Hawk

Helicopter revitalization program launches final refurbished Black Hawk: "The UH-60A Recapitalization Program kicked off during 2002 with the induction of the first A-to-A aircraft at Corpus Christi Army Depot. The first was delivered in 2003 marking the culmination of a successful partnership between Sikorsky Aircraft and the depot.

'Completion of the last UH-60 A-to-A aircraft is certainly a milestone of amazing success,' said Col. Joe Dunaway, commander of Corpus Christi Army Depot. 'More importantly it marks the next chapter of the Army's continued journey to recapitalize the entire UH-60A/L fleet.'"

Thursday, October 29, 2009

Insatiable Demand Fuels Boom In UAV Market

Insatiable Demand Fuels Boom In UAV Market: "The UAV market has seen unprecedented growth since 2001, with its current projected value over the next 10 years estimated at $17.9 billion.
'An insatiable demand for unmanned air vehicles is fueling massive growth within this market,' said Larry Dickerson, senior unmanned systems analyst for Forecast International. 'No matter how many UAVs are built, military agencies want more.'"

Tuesday, October 27, 2009

C-27J aka "C-130 Light"

Air Force plans to include the C-27J Spartan, the latest propeller-driven airlifter planned for the Air Force inventory, are steadily progressing.

In April, through Resource Management Decision 802, Defense Secretary Robert Gates moved the C-27J program and its related direct support mission from the Army to the Air Force. Since April, the Air Force and Air Mobility Command have taken a serious approach to building the program, officials said.

Currently, the C-27J program office at Wright-Patterson AFB, Ohio, is standing up while at the same time the Joint Program Office at Redstone Arsenal in Huntsville, Ala., is staying open through approximately the end of fiscal 2010 (Sept. 30, 2010) to promote a smooth transition.

"The program is in transition from an Army-led joint program to a sole Air Force program," said Lt. Col. Gene Capone, AMC's C-27J test manager at the Joint Program Office. "Making a switch like this is no small affair, especially at this phase in the acquisition process. Because the Army lost all fiscal year 2010 C-27J funding due to RMD 802, the Air Force is funding the Army to continue leading the program through completion of Multi-Service Operational Test and Evaluation."

The Air Force will field 38 C-27Js, operated by the Air National Guard. Two of the 38 programmed C-27Js are currently going through qualification and operational testing with a final basing plan forthcoming.

In the development of the C-27J for use by the U.S. military, officials have been putting the C-27J through rigorous evaluation. Through this effort, they validate key performance parameters, prove airdrop capabilities, determine defensive systems effectiveness, certify communications interoperability and ascertain aeromedical compatibility of the aircraft. Additionally, they hold live-fire testing and evaluation of key system components during this thorough production qualification testing.

"Then the aircraft goes into Multi-Service Operational Test and Evaluation to determine its capabilities in an operationally relevant environment," Colonel Capone said.

The C-27J is an "extremely rugged" aircraft, designed for austere environments. Although it has yet to complete its testing, officials say it should thrive in the "dirt."

"Think of the C-27J as a 'mini-Herc' -- it looks like and acts like a C-130, but it is about half the size (3.5 pallet positions versus 6 to 8 pallets for the C-130)," Colonel Capone said. "This smaller size brings efficiency of scale to the Air Force's portfolio of airlifters."

Pilots testing the plane at Redstone Arsenal are waiting until testing is completed before they talk more about the plane's capability, but Colonel Capone did say "it is very powerful and agile."

"It flies a lot like a C-130, but with a bit more power for its weight," he said. "Of course, as with most airplanes the pilots who fly the aircraft love it -- myself included."

Headquarters AMC officials at Scott AFB, to include Maj. Gen. Brooks Bash, Director of the Air, Space and Information Operations Directorate, say the work to build the C-27J's capability to fully support the Army's needs in the U.S. Central Command area of responsibility is also continuously progressing.

"The Secretary of Defense gave us the C-27J and its mission to the Air Force and we are 100 percent committed to making this work," General Bash said.

Col. Bobby Fowler, also from AMC's Air, Space and Information Operations Directorate, said the command is developing the C-27J's Concept of Employment, or CONEMP, for the Air Force's plans to support the Army's direct support mission program.

A formal test is taking place from October through December in Iraq to gather information on this new Air Force mission. The test's purpose is to validate the CONEMP and to ensure the Air Force is ready to implement this mission in 2010, Colonel Fowler said. "This test will help us work out the command and control structure of the direct support mission and help us to validate requirements."

Officials note that even with the on-going direct delivery CONEMP test, the Air Force is firmly meeting the mission of directly supporting the warfighter. An example of that support, especially in Afghanistan where U.S. and coalition forces operate in a land-locked country with austere terrain, is through airdrops -- a record amount of airdrops.

In June, a record 2.8 million pounds of cargo was airdropped, only to be beaten in July with 2.9 million, in August with 3.6 million, and again in September with 3.6 million pounds. That's more than 12.9 million pounds of much-needed combat supplies directly delivered to ground forces during the recent surge into Afghanistan for Operation Enduring Freedom. 

The record number of pounds delivered also means record numbers of airdrop bundles delivered. As an example, in 2007, the Air Force airdropped 5,675 cargo bundles to troops in Afghanistan. In 2009, with an average of about 1,300 bundles a month, the Air Force is on pace to airdrop more than 18,500 bundles this year -- more than tripling the pace of two years ago. This is accomplished with C-17 Globemaster III and C-130 Hercules aircraft. 

In 2009, mobility Airmen have also fulfilled other quick-response, direct support requirements within the U.S. Central Command area of responsibility. In the first seven months of 2009, the Air Force met more than 750 distinguished visitor movements and more than 250 urgent aeromedical evacuation movements from both Iraq and Afghanistan.

That support is also highlighted in the intra-theater airlift for Iraq and Afghanistan by the Air Force. Through August, in both Iraq and Afghanistan, AMC aircraft have moved more than 815,000 passengers. In August alone, AMC aircraft moved more than 73,000 passengers in Iraq -- many of those Army Soldiers. In the same month for Afghanistan, AMC aircraft moved more than 27,000 passengers with many of them being Army Soldiers as well.

Army Sgt. Angel Quiles Ramos, from Charlie Battery, 1st Battalion, 43rd Air Defense Artillery deployed to an undisclosed base in Southwest Asia, said the support he receives from the Air Force at his deployed base is "critical."

"They provide food, security and water," Sergeant Ramos said. "We don't have to get water because they bring it to us. If anything breaks, we call them and they come to fix it. This is critical because the Air Force provides everything so we can do the mission."

In receiving the C-27J program and its mission, officials say there is a lot to do as more and more C-27s come into the inventory. However, they say the foundation of this is to build trust and responsiveness.

A concept like this will take time and effort, but most importantly it will also require feedback from the forces, Colonel Fowler said. AMC and Air Force officials plan to continuously review and update the C-27J and the direct support processes using inputs from field commanders until it is incorporated into joint doctrine.
 
S.T. Sturkol (AMC)
# END